Wednesday, May 17, 2023

Akses server BBN Pilot Plant

Google Formulir
Saya mengundang Anda untuk mengisi formulir:
Akses server BBN Pilot Plant
Mohon dibantu untuk nama, NPK dan Email masing2 Lead dan Engineer agar mendapatkan akses server.
Isi formulir
Buat Google Formulir sendiri

Wednesday, March 25, 2020

Re: AWAITING YOUR URGENT RESPONSE

Dear andrew.ranto.yasser.tonasa Greetings to you, Thank you for the opportunity to put forward our business proposal to you and your time of evaluation. It is our pleasure to contact you as we are starting to make more funding to invest into a large scale business establishments and projects, around the world. We meditate for some high net worth private investors/Politicians from middle East, European, African and Asian business tycoons with liquid and block funds ready for placement from 0% to 100% funding of a viable a genuine project of high magnitude as long you fit their criteria and we will set up an agreement/MOU between you and our private investors after all due diligence. They are looking for a 5 to 10 years investment period for negotiable 3% to 5% of the investment returns annually as the interest of the Fund and can roll over after the expiration if all things being equal. Please if you are interested and have a project that needs funding, we will like to have your company profile and project summary with it geographical area to broker the investment funding to your favor according to our investor's term, You have to also officially engage us by sending to us a letter of interest (LOI) to enable us to facilitate your needed loan facility request in less than 15 working days if registered with us. Please note that no upfront 1% commission to the facilitators, our conditions will be placed on our MOU /contract including the interest rate between 3% to 5% negotiable yearly reimbursement with 1 or 2 years moratorium period based on the nature of your project/business proposal. Finally, if you don’t have any viable project, then we implore you to source from your colleagues and clients that have a genuine project yet to be financed due to inadequate funding. Also bear in mind that any referral you bring to our notice, you will receive a commission on our payroll schedule for your services rendered. Do get back to us through above our contact at your earliest convenience, with your project scope or referral proposition, to proceed and secure your desired funding needs. Sincerely, David Lean Russel Investments Finance Adviser

Wednesday, September 21, 2016

Start Light Fuel Oil (LFO) Burner @First Firing - 10 Sept 2016

1. Start Bottom Ash Handling (BAH)
- Level BAH column overflow
- Start pump 6P-4033-JA or B.. (To be overflowed)...

2. Start Gas Air Heater (GAH)
- Lube oil GAH auto mode...

3. Persiapan start IDF & FDF
- Yakinkan inlet damper IDF & FDF fully close..
- Posisi LCP remote..
- IDF damper mode : AUTO --> 0% open..
- FDF damper mode : CASCADE --> 0% open..
- Overfire damper : CASCADE --> 0% open..
- Secondary air damper : AUTO --> 0% open..
- Bypass coal gate (core air) --> AUTO --> 0% open..
- Economizer outlet damper : Posisi manual --> 100% open..
- Bypass economizer : manual --> 100% open..
- Solenoid bypass 100% (auto open)..

4. Ensure condition "OPEN"..
- MOV-2113 (venting steam drum)..
- MOV-2122
- MOV-2124
- MOV-2125
- MOV-2131
- MOV-2132

5. Start IDF, make sure IDF full speed and indikasi arus di DCs normal..

6. Start FDF, ketika flow FDF menuju 5 kNm3/h, IDF damper mulai operasi..
- Monitoring press P21A. 2461 (SP - 20 mmWC).
- Overfire damper open 100%..
- Secondary damper open 100%..

7. - Ketika flow combustion air >= 67.3 kNm3/h --> purge permit..
- Ketika flow combustion air >= 75 kNm3/h --> purge progress release 300 s.. (Indikasi DCS hijau)..

8. Leak check sequence
- Start LFO transfer pump 6P-4003 JA/B; SP = 22 kg/cm2..
- Start LFO leak check
- Setelah leak check, MFT reset..
Kondisi MFT reset: Overfire damper 25% open, Secondary air damper 30% open.

9. Start IAF..

10. Manualkan FDF damper --> naikkan flow menuju 90 kNm3/h..

11. Start burner (A1 --> B4), Ignition Igniter Sequence, Igniter Burner Sequence, Extraction Sequence..

Thursday, January 28, 2016

Monday, February 23, 2015

Fwd: Lion Air eTicket (ISHBTU) - Mr Andrew Ranto Yasser Pasaribu


---------- Forwarded message ----------
From: Lion Air eTicket <confirmation@portal.lionair.co.id>
Date: 2015-02-22 22:07 GMT+07:00
Subject: Lion Air eTicket (ISHBTU) - Mr Andrew Ranto Yasser Pasaribu
To: andrew.ranto.yasser@gmail.com


Dear Mr Andrew Ranto Yasser Pasaribu,

Please find attached your Lion Air eTicket in a PDF format. Kindly note that you will be required to carry a printout of your eTicket to gain entry into the airport and for check-in along with a valid photo identification as mentioned in your itinerary.

We thank you once again for choosing Lion Air.

For any clarifications please write to info@lionair.co.id.

Looking forward to having you on board!

Sincerely

Lion Air Team




--
Best Regards,

Andrew R. Y. Pasaribu

Saturday, June 15, 2013

Karaoke List

1. Dewa- Risalah Cinta
2. Ada Band- Setengah Hati
3. Dewa- Selimut Hati
4. Queen- To Be With You
5. Ada Band- Manusia Bodoh
Powered by Telkomsel BlackBerry®

Thursday, June 13, 2013

Mario Riwawo-20130609- Jalan2 Soppeng

Jalan2 Soppeng, highlanding for permandian Lewu
Powered by Telkomsel BlackBerry®

Friday, May 31, 2013

Bungoro-20130531- Fixing Backwash line for VAF

They are fixing 2" backwash line of Automatic Screen Valve...

Thank you
Powered by Telkomsel BlackBerry®

Saturday, May 25, 2013

Bungoro-20130523-Penggantian Target Plate

Tareget plate is changing to the new one fot steamblowing unit-D... Banzaaiiii...
Powered by Telkomsel BlackBerry®

Friday, May 24, 2013

Penggantian Cartridge Filter BWRO

Penggantian 19ea filter BWRO 10 micron...

Powered by Telkomsel BlackBerry®

Thursday, May 23, 2013

Bungoro-20130523- Penggantian Cartridge filter ALN05M-60B

Penggantian cartridge filter SWRO-B... Filter size 5 micron
Powered by Telkomsel BlackBerry®

Wednesday, May 15, 2013

Bungoro-20130501- Sea Water Intake Dredging

This crane is taking out sludge of coal... The sludge reaches 2 meters thick of 6 meter bottom-sea-level...

From the beginning to last month of this project, the troubleshooting can't give the best result...

In my opinion, we should make a channel to the SWI, so the sludge would not move to the suction pump of SWI...

Thanks and regards,
Andrew
Powered by Telkomsel BlackBerry®

Friday, May 10, 2013

Diesel engine fire water pump

For line check

My beautiful lingga, Demin Water Tank

This is my beautiful lingga, Demin water tank at the water treatment plant..

Code : API 650 11th
Design Press : ATM
Design Temp : 30 oC
Diameter : 4800 mm
Height : 12 000 mm
Nom. Capacity: 217.1 m3
Year built : 2011
Engineered by: PT Rekind & PT. Swadaya Graha-Gresik

Powered by Telkomsel BlackBerry®

Wednesday, May 8, 2013

PC piping Reinstatement

PC piping reisntatement from the leakage test...

Coal ash from the conveyor

Unusual coal ash from the conveyor

Wednesday, August 15, 2012

Bungoro-20120815- Sea Water Basin

Sea Water Basin right here, upward the WTP Area...
Sent from my i-net masuk desa®

Bungoro-20120815 Mechanical Test Run SWRO Feed Pump C03WP514A

Mechanical Test Run SWRO Feed Pump C03WP514A...

Vibration for motor = ave. 3.0 mm/s2
Vibration for pump(I) = ave. 50.0 mm/s2
Temp(I) = 50.C
Sent from my i-net masuk desa®

Tuesday, August 14, 2012

LT-003 Level Transmitter in the Raw Water Storage Pond

This is LT-003 Level Transmitter in the Raw Water Storage Pond... The LT is based on sonic indicator.. LT transmit and receive back the sound...

LT-003 has been punch-killed already.. :)

I'm trying to microblog my site experience via my mobile phone.. Please connect to my mobile blog.. Test accepted, approved.. Thanks...
Sent from my i-net masuk desa®

Sent from my i-net masuk desa®

Monday, January 12, 2009

BIP Pizza Hut Smile on Sunday Morning


Itin,Ira,Bang Fajar and I had breakfast on Dago. Smilee...:-D

Netherlander and Newzealander


The expatriates with action. Ya,mirip2 perantau tangguh lah. Dave Jenson and Van de Wydeven.

Wednesday, January 7, 2009

VELAN 36'' Separator Outlet CrossOver Valve


A little bit huge 36'' valve is opened when combined operation to activated.

Sunday, January 4, 2009

Ampera Smile on Sunday


There are three smiles. May they influence you guys to have a good night too. C u. Regards from ap.

Kota Kembang Smile on Sunday


Actually,it is a forbidden place. But, for evidence of crime, i bought two cds mp3. :-P Ok,that's all for today. After BEC, GRAMEDIA,then Kota Kembang. C u.

Too cool to be deleted


Enjoy the view of pangalengan field.:-D

Gramedia Smile on Sunday.


Cheerz up coiii. May God be with u always.:-D

What a sunday morning!


(Insert 'monday morning' by maroon5) :-P

Saturday, January 3, 2009

20090103 view..


View from 80 area on 12 o'clock.
Regards from ap.

Friday, January 2, 2009

Wash water FIT


There's an error for indication. It says error 3. We still search the factor. Any obstruction with the power cable or just the setting.
Warm regard from ap.

LCV


This LCV is used to control condensate level of scrubber. It is active when high alarm on. High alarm on is at 100 mm level. While at 800, high high level on.
Warm regards from ap.

Sunday, December 28, 2008

The Blog Readibility Test

blog readability test

TV Reviews




Any comment??
hihihi, just for info and intertainment...

Saturday, December 27, 2008

Rock Muffler


This is the place where excess steam to blow while we maintain the inlet turbine pressure.
Regards from ap.

Turbine Rupture Disc Bursting


This is the incident of turbine outlet rupture disc bursting. It was happened when there was overpressure at the condensor. The rupture disc is installed to protect the turbine from backpressure.
Regards from ap.

PIT and FIT combination


Annubar will indicate the pressure drop of steam flow. And with the function of state pressure (PIT)and temperature, FIT convert the data to steam flow variable.
Regards from ap.

PCV


This valve is used to control the steam pressure which enter the scrubbers. The set point pressure for the inlet scrubber is 10.1 barG.
Regards from ap.

Cooling Tower


Steam condensate cooling process is conducted here. With capacity about 220 kg/s, it is totally huge cooling tower.
Warm regards from ap.

Annubar





This is annubar which used to measure steam flowrate range 0-150 kg/s. The range for dP 0-1500 mmH2O. The sensitivity is quite worse when in low range flowrate,0-10 kg/s. Seems i'll go to check this phenomenon.

Scrubbers


These are 4 scrubbers which used to scrub mist from steam. Steam quality increase from 98.0% to 99.8%. The performance is good, with delta P is 15 KPa.
Warm regards from ap.

What a wonderful saturday morning!


Once again, i capture the similar with view position 'what a monday morning on december!' Hope u can enjoy the 'updated' view. Have a good day, Pals.
Warm Regards,
ap

Friday, December 26, 2008

Merry Christmas 20081225 and Happy New Year 20090101


Dear Friends and Colleagues, for the christmas and the new year, i wish u all the best from the buttom of my heart. Fresh ideas, fresh projects, and fresh feeling in the New Year 2009.

Yours faithfully

andrew r y pasaribu

Sunday, December 7, 2008

DCS Control Room


Two monitors of dcs display. Controlling fcv and pcv is from here. Banzai.

Thursday, December 4, 2008

Rupture Disk and PSV


This is the psv and rp configuration. Three psv set on 13.8 barG and other 5 rp set on 14.49 barG. We continue to see for the performance. 20081204

Wednesday, December 3, 2008

When cloud is too low


It is cold. No question. Even my thumbs is too slow to write this blog.huah.

From up to buttom


Steam comes from the well to separators. And now,steam is blowing, and instrument and control system ready to be used.

Monday, December 1, 2008

What a monday morning on december!


Monday morning,terrific on the silver december. Passing little road on Pangalengan to the office. Guys,have a good day ya.

Sunday, November 30, 2008

Sunday Morning Nov 30 08


Enjoy your sunday morning. Refreshing in church is quite wonderful. Singing with smile, praising Allah with joy. Good sunday.

Thursday, November 27, 2008

When u cannot see the difference between steam and cloud


Can u imagine? Having refresh while steam and cloud colaborating in harmony. Here it is.

Tuesday, November 25, 2008

Steam 100% capacity


You can see the full capacity of steam delivered to the rock muffler. It is 220 kg/s and 10.1 barg.

Dirty condensate


After blowing,pressurizing, initially the condensate is still dirty for several minutes.