Saturday, December 27, 2008

Rock Muffler


This is the place where excess steam to blow while we maintain the inlet turbine pressure.
Regards from ap.

Turbine Rupture Disc Bursting


This is the incident of turbine outlet rupture disc bursting. It was happened when there was overpressure at the condensor. The rupture disc is installed to protect the turbine from backpressure.
Regards from ap.

PIT and FIT combination


Annubar will indicate the pressure drop of steam flow. And with the function of state pressure (PIT)and temperature, FIT convert the data to steam flow variable.
Regards from ap.

PCV


This valve is used to control the steam pressure which enter the scrubbers. The set point pressure for the inlet scrubber is 10.1 barG.
Regards from ap.

Cooling Tower


Steam condensate cooling process is conducted here. With capacity about 220 kg/s, it is totally huge cooling tower.
Warm regards from ap.

Annubar





This is annubar which used to measure steam flowrate range 0-150 kg/s. The range for dP 0-1500 mmH2O. The sensitivity is quite worse when in low range flowrate,0-10 kg/s. Seems i'll go to check this phenomenon.

Scrubbers


These are 4 scrubbers which used to scrub mist from steam. Steam quality increase from 98.0% to 99.8%. The performance is good, with delta P is 15 KPa.
Warm regards from ap.

What a wonderful saturday morning!


Once again, i capture the similar with view position 'what a monday morning on december!' Hope u can enjoy the 'updated' view. Have a good day, Pals.
Warm Regards,
ap

Friday, December 26, 2008

Merry Christmas 20081225 and Happy New Year 20090101


Dear Friends and Colleagues, for the christmas and the new year, i wish u all the best from the buttom of my heart. Fresh ideas, fresh projects, and fresh feeling in the New Year 2009.

Yours faithfully

andrew r y pasaribu

Sunday, December 7, 2008

DCS Control Room


Two monitors of dcs display. Controlling fcv and pcv is from here. Banzai.

Thursday, December 4, 2008

Rupture Disk and PSV


This is the psv and rp configuration. Three psv set on 13.8 barG and other 5 rp set on 14.49 barG. We continue to see for the performance. 20081204

Wednesday, December 3, 2008

When cloud is too low


It is cold. No question. Even my thumbs is too slow to write this blog.huah.

From up to buttom


Steam comes from the well to separators. And now,steam is blowing, and instrument and control system ready to be used.

Monday, December 1, 2008

What a monday morning on december!


Monday morning,terrific on the silver december. Passing little road on Pangalengan to the office. Guys,have a good day ya.